The City of
PPC Vader Dispense Equipment for $6 Billion Water Tunnel Project
September 2005 – New York City, NY - When the city of New York and the Department of Environmental Protection (DEP) needed polyurethane foam spraying equipment for their $6 Billion Water Tunnel project, they called Polymer Processing Company (PPC), from Apopka, FL for the solution. PPC is a custom manufacturer of plural component foam, coatings and dispensing equipment.
Foaming of the
PPC delivered multiple Vader Series Spray Foam Machines to the jobsite for the primary application and redundancy back-up program. Frank Bien, PPC’s chief engineer, was on hand during the September start-up to provide training and technical assistance to the multi-shift construction operation. The Vader’s simplicity of operation and design made it possible for Bien and the construction team to set up and cover the necessary training in a very short period of time.
Al Ward from AWS, was also on hand for training and additional technical support. Once the equipment was set-up and ready to spray, Ward climbed into the 30 foot diameter hole and led the construction team through the spraying portion of the foam application and training operations. In just a few short minutes, the construction crew was trained and spraying foam on their own.
The engineers are utilizing a “geothermal” excavation technique using liquid nitrogen that is piped around the perimeter of the hole down to 125 feet. The liquid nitrogen actually freezes the earth and mud, and prevents it from falling back into the hole upon excavation, due to its frozen and solidified state. Once the hole has been excavated, the perimeter is wrapped with a wire mesh material and the PPC Vader Series machines spray apply the foam to the mesh. The foam retains the loose dirt and insulates the frozen earth.
A city engineer on hand for the training claimed that, “Construction site durability, price point and the pure spraying performance of the Vader Machine Series made their decision to go with PPC an easy and successful one.”
“It is important for the public to understand the significance of what’s taking place in the lower depths of our City as we build new infrastructure for the 21st Century,” said Mayor Bloomberg. “This is the largest public works project the City has ever undertaken and is an engineering feat of gigantic proportion. Though rarely seen by the public, this project will increase our water systems reliability and will instill a sense of security in our City’s ability to provide essential services for future generations.”
The combination of PPC’s robust industrial strength equipment, hands-on training and application experience allowed the NYC construction team to acquire the necessary training and rapidly apply spray foam in this unique application in only one day.
More information about the entire tunnel project and Polymer Processing Company’s Vader Series Foam and Coatings Equipment can be found online at PPC’s website www.polyproco.com. Or, call PPC today at 407-880-8739 to speak with a sales/service technician and see how PPC’s industrial strength equipment, and professional service and can help your company.
| Next > |
|---|



